Design, realisation and verification of low noise construction methods and noise reduction techniques during construction of offshore wind turbines (Schall 3)
Led by: | Prof. Dr.-Ing. habil. Raimund Rolfes |
Team: | Jörg Rustemeier, M.Sc., Dr.-Ing. Tanja Grießmann |
Year: | 2007 |
Funding: | Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety - FKZ 0327645 |
Duration: | 2007-2011 |
Is Finished: | yes |
The final report can be found here.